|
 S.
Harris & Co. conducted a thorough physical inspection and prepared
measured drawings of the upper level structure of the former barn at Mensch
Mill. The firm analyzed the issues and engineered remedial measures for
the stabilization process. Measure drawings and specifications were
prepared. The drawings included a step by step procedure for stabilizing
the historic barn.
Click here to read "The Tale of Two Barns"
--S. Harris & Co.
Comprehensive Project List-- |